IQC incoming quality control
RD research development center
IPQC in process quality control
RD HQ research development center head quarter
FQC final quality control
QA quality assurance
BOM bill of material
PVT product verification test
OQC outgoing quality control
PRP phase review process
QE quality engineering
PM project management
DCC document center control
PJE project engineer
ECN engineering change notice
PE product engineer
ECR engineering change request
NPI new product introduction
MRB material review bom
MP mass production
CAR corrective action request
MFG manufacturing
FPC flexible printed circuit board
ME mechanical engineer
NCR non conforming report
KBD keyboard
OBE out of box evaluation
IFR instant failure rate
IQA internal quality audit
IFIR instant failure incident rate
PCR process change request
HW hardware
IPO internal purchase office
N/A No Action
IE industrial engineering
ESD electrostatic discharge
QPA quality process audit
EOL end of life
QSA quality system audit
EN engineering notice
ATE automatic test equipment
EMI electromagnetic interference
AOI automatic optical inspection
EMC electromagnetic compatibility
PCBA print circuit board assembly
EE electronic engineer(ing)
TTL technology transfer list
EDC electronic data center
SQA supplier quality assurance
ECO engineering change order
ORT ongoing reliability testing
DVT design verification test
QM quality manual
DOA dead on arrival
SW software
CAD/ID computer aided design /industrial design
SOW standard of work
BIOS basic input /output system
SCSI small computer system interface
AP application program
SA software application
AFR annual failure rate
SO sales order
NTF no trouble found
MRP material requirement planning
CND can not duplicate
AVL approved vendor list
DPPM defect parts per million
FAI first article inspection
FMEA failure mode effect analysis
CLCA closed loop corrective action
LRR line reject rate measured by DPPM
MQR monthly quality review
MTQ manufacturing ,test and quality
RCA root cause analysis
PFMEA process failure mode effect analysis
SFIS Shop Floor Information System
QEM Quality engineering measurement
BGA Ball Grid Array
IC Integrated Circuit
QFP Quad Flat Pack
EOS Elwctrical Over Stress
TNB terminal notebook business
SMT Surface Mount Technology
品質(zhì)人員名稱類
QC quality control 品質(zhì)管理人員
FQC final quality control 終點(diǎn)品質(zhì)管制人員
IPQC in process quality control 制程中的品質(zhì)管制人員
OQC output quality control 最終出貨品質(zhì)管制人員
IQC incoming quality control 進(jìn)料品質(zhì)管制人員
TQC total quality control 全面質(zhì)量管理
POC passage quality control 段檢人員
QA quality assurance 質(zhì)量保證人員
OQA output quality assurance 出貨質(zhì)量保證人員
QE quality engineering 品質(zhì)工程人員
品質(zhì)保證類
FAI first article inspection 新品首件檢查
FAA first article assurance 首件確認(rèn)
CP capability index 能力指數(shù)
CPK capability process index 模具制程能力參數(shù)
SSQA standardized supplier quality audit 合格供應(yīng)商品質(zhì)評(píng)估
FMEA failure model effectiveness analysis 失效模式分析
FQC運(yùn)作類
AQL Acceptable Quality Level 運(yùn)作類允收品質(zhì)水準(zhǔn)
S/S Sample size 抽樣檢驗(yàn)樣本大小
ACC Accept 允收
REE Reject 拒收
CR Critical 極嚴(yán)重的
MAJ Major 主要的
MIN Minor 輕微的
Q/R/S Quality/Reliability/Service 品質(zhì)/可靠度/服務(wù)
AOD Accept On Deviation 特采
UAI Use As It 特采
FPIR First Piece Inspection Report 首件檢查報(bào)告
PPM Percent Per Million 百萬分之一
制程統(tǒng)計(jì)品管專類
SPC Statistical Process Control 統(tǒng)計(jì)制程管制
SQC Statistical Quality Control 統(tǒng)計(jì)品質(zhì)管制
GRR Gauge Reproductiveness & Repeatability 量具之再制性及重測性判斷量可靠與否
DIM Dimension 尺寸
DIA Diameter 直徑
N Number 樣品數(shù)
其它品質(zhì)術(shù)語類
QIT Quality Improvement Team 品質(zhì)改善小組
ZD Zero Defect 零缺點(diǎn)
QI Quality Improvement 品質(zhì)改善
QP Quality Policy 目標(biāo)方針
TQM Total Quality Management 全面品質(zhì)管理
RMA Return Material Audit 退料認(rèn)可
7QCTools 7 Quality Control Tools 品管七大手法
通用之件類
ECN Engineering Change Notice 工程變更通知(供應(yīng)商)
ECO Engineering Change Order 工程改動(dòng)要求(客戶)
PCN Process Change Notice 工序改動(dòng)通知
PMP Product Management Plan 生產(chǎn)管制計(jì)劃
SIP Standard Inspection Procedure 制程檢驗(yàn)標(biāo)準(zhǔn)程序
SOP Standard Operation Procedure 制造作業(yè)規(guī)范
IS Inspection Specification 成品檢驗(yàn)規(guī)范
BOM Bill Of Material 物料清單
PS Package Specification 包裝規(guī)范
SPEC Specification 規(guī)格
DWG Drawing 圖面
系統(tǒng)文件類
ES Engineering Standard 工程標(biāo)準(zhǔn)
CGOO China General PCE龍華廠文件
IWS International Workman Standard 工藝標(biāo)準(zhǔn)
ISO International Standard Organization 國際標(biāo)準(zhǔn)化組織
GS General Specification 一般規(guī)格
部類
PMC Production & Material Control 生產(chǎn)和物料控制
PCC Product control center 生產(chǎn)管制中心
PPC Production Plan Control 生產(chǎn)計(jì)劃控制
MC Material Control 物料控制
DC Document Center 資料中心
QE Quality Engineering 品質(zhì)工程(部)
QA Quality Assurance 品質(zhì)保證(處)
QC Quality Control 品質(zhì)管制(課)
PD Product Department 生產(chǎn)部
LAB Laboratory 實(shí)驗(yàn)室
IE Industrial Engineering 工業(yè)工程
R&D Research & Design 設(shè)計(jì)開發(fā)部
生產(chǎn)類
PCs Pieces 個(gè)(根,塊等)
PRS Pairs 雙(對(duì)等)
CTN Carton 卡通箱
PAL Pallet/skid 棧板
PO Purchasing Order 采購訂單
MO Manufacture Order 生產(chǎn)單
D/C Date Code 生產(chǎn)日期碼
ID/C Identification Code (供應(yīng)商)識(shí)別碼
SWR Special Work Request 特殊工作需求
L/N Lot Number 批號(hào)
P/N Part Number 料號(hào)
OEM Original Equipment Manufacture 原設(shè)備制造
PC Personal Computer 個(gè)人電腦
CPU Central Processing Unit 中央處理器
A.S.A.P As Soon As Possible 盡可能快的
E-MAIL Electrical-Mail 電子郵件
N/A Not Applicable 不適用
QTY Quantity 數(shù)量
I/O input/output 輸入/輸出
NG Not Good 不行,不合格
C=0 Critical=0 極嚴(yán)重不允許
APP Approve 核準(zhǔn),認(rèn)可,承認(rèn)
CHK Check 確認(rèn)
ASS'Y Assembly 裝配,組裝
T/P True Position 真位度
5WIH When, Where, Who, What, Why, How to
6M Man, Machine, Material, Method, Measurement, Message
4MTH Man, Material, Money, Method, Time, How 人力,物力,財(cái)務(wù),技術(shù),時(shí)間(資源)
SQA Strategy Quality Assurance 策略品質(zhì)保證
DQA Design Quality Assurance 設(shè)計(jì)品質(zhì)保證
MQA Manufacture Quality Assurance 制造品質(zhì)保證
SSQA Sales and service Quality Assurance 銷售及服務(wù)品質(zhì)保證
LRR Lot Reject Rate 批退率
SPS Switching power supply 電源箱
DT Desk Top 臥式(機(jī)箱)
MT Mini-Tower 立式(機(jī)箱)
DVD Digital Video Disk
VCD Video Compact Disk
LCD Liquid Crystal Display
CAD Computer Aided Design
CAM Computer Aided Manufacturing
CAE Computer Aided Engineering
PCB Printed Circuit Board 印刷電路板
CAR Correction Action Report 改善報(bào)告
NG Not Good 不良
WDR Weekly Delivery Requirement 周出貨要求
PPM Percent Per Million 百萬分之一
TPM Total Production Maintenance 全面生產(chǎn)保養(yǎng)
MRP Material Requirement Planning 物料需計(jì)劃
OS Operation System 作業(yè)系統(tǒng)
TBA To Be Assured 待定,定缺轉(zhuǎn)載請(qǐng)注明出自六西格瑪品質(zhì)論壇